006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Black
Made of durable nylon material with a 360° rotating black heavy-duty clip and soft padding
Very suitable for large, medium and small dogs
This dog training leash and collar set is made of strong climbing rope and a durable 360-degree non-tangled rust-proof rotating hook, which is stronger than other standard dog leashes and collars
With heavy metal buckles, when your dog suddenly tries to run, it can firmly grasp the collar or seat belt
Reflective stripes with highly reflective light can help you and your dog stay safe at night
Size: 120cm
Package included:
1 x Dog Training Leash
Other things not included
Specifications
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Black
Item No.: Â 642200027E
Same model in different colors:
SaveÂ
Price Match
BUY NOW
ADD TO CART
Add to Wishlist
Estimated Shipping Cost:More Shipping Options
Shipping To  Sorry, there are no shipping methods available for your country.